MIS 60 - inclined building entry

Universal building entry for inclined entries through the base slab. For gas- and watertight connection of building entries in open construction according to DIN 18195 part 4. The only building entry with an integrated injection membrane - for controlled resin injection and significantly reduced installation time. The perfect seal in core drills with Ø 62 - 65 mm for 1 cable/SpeedNet conduit Ø 6 – 34 mm or 4 cables/SpeedNet conduits Ø 5 – 7 mm. Perfect sealing of the cables without any shrinking procedures.

gas- and watertight up to 1 bar

installation takes only a few minutes

integrated blind seal

for core drills of Ø 62 – 65 mm

sealing of:
1 cable/SpeedNet conduit Ø 6 – 34 mm
or 4 cables/SpeedNet conduits Ø 5 – 7 mm

Lieferumfang (VPE):

10 off MIS 60-S

10 off Hauff-2K expansion resin IM3000,
150 ml

1 off quick tensioning device MIS-SVS

10 off installation instructions